TRANS TRITIA - Work Package 2
The Action Plans forming part of the Thematic Work Package 2
are based on the activity of individual countries, i.e. Poland, the Czech Republic and Slovakia, seeking to develop a network of waterways.
The TRITIA Waterway Action Plan was created with the output from the following documents “Inland Waterway system at TRITIA area” and “Road to inland waterways transfer of shipment”
Mainly it focuses on two levels:
- implementation of the intention of build waterways to the strategies on regional/national/European level,
- prioritization of sections of planned waterway connection, including their budgets.
TRITIA Railway Action Plan
This Action Plan was drawn for cross-border area the EGTC TRITIA based on:
“Report of increase capacity of the rail connections at TRITIA area” and “Road to rail potential shift of transport flows”. It mostly focuses on:
-predicting of transport flows in year 2030
-addition of 30% transport shift from road to other modes according to White paper EU from 2011
-describing of bottlenecks in 2030(planned infrastructure up to 2030 is included as existing)
-proposal of new infrastructure projects to eliminate bottlenecks
-proposal of legislative steps supporting shift of transport flows from road to other modes.
TRITIA Intermodal Logistic Terminals Action Plan
TRITIA Intermodal Logistic Terminals Action Plan was drawn for cross-border area is based on
Map of Intermodal Logistic Centres/Terminals at TRITIA area, and
Intermodal Logistic Centres/Terminals at TRITIA area– Present and Future,
The Action plan is based also on the stakeholder workshop and is targeted until 2030 year.
The Action Plan focus on two levels:
-upgrading existing logistic centres/terminals and their better connection to main transport infrastructure
-proposal of new locations of logistic centres/terminals with possible connection to planned waterways.